SBB IC 5 connects Zürich HB to Lugano through the Gotthard Base Tunnel, the world's longest railway tunnel at 57 km. Since 2016, the new base tunnel reduces the journey from 3.5 hours to under 2.5 hours, passing under the Alps at 550m altitude instead of the old mountain route at 1,100m.
Timetable data is sourced from official Switzerland railways records. Always verify with the official operator before travelling.
SBB IC 5 connects Zürich HB to Lugano through the Gotthard Base Tunnel, the world's longest railway tunnel at 57 km. Since 2016, the new base tunnel reduces the journey from 3.5 hours to under 2.5 hours, passing under the Alps at 550m altitude instead of the old mountain route at 1,100m.
The train runs on every day of the week. The full route covers 2 stops with a total journey time of approximately 2h 25m.
Available travel classes include 2nd Class, 1st Class. Fares start from CHF 35 for 2nd Class.
Passengers are advised to arrive at the station at least 30 minutes before the scheduled departure time to locate the correct platform and coach.
Reserved seating
Reserved seating
Visit your nearest railway station booking office with valid ID.
Contact Switzerland Railways for schedule info via their official website or helpdesk.
Want GPS tracking, fare updates, or corrected stop times for SBB IC 5 Zürich–Lugano? Let us know.